fbpx

    Order / Enquire Now

    To order a product or to ask us a question, speak to our team on 0208 916 2222 or use the live chat facility in the corner of your screen. Alternatively, fill in the simple form below and we will endeavour to respond within 48 hours

    • Please see the Website terms & Conditions at the bottom of the homepage

    News

    Do Green Roofs Requirement Maintenance?

    July 20th, 2021

    Whilst it is certainly true that green roofs do not require a huge amount of maintenance, it is not true that they require no maintenance whatsoever.

    They are living structures and as such, will need attention throughout their lifespan.

    Some vegetation types such a sedum are planted as they require less maintenance than grass roofs for example. However, regular attention to soil moisture and feed levels, as well as the removal of weeds, is essential to maintain optimum performance.

    Fertiliser added to a green roof

    Maintenance of M-Trayยฎ modular green roof

    The M-Tray system is a portable, modular system that consists of a specially-designed HDPE tray filled with a blend of mineral and organic substrate and a carefully-selected range of sedum species pre-grown to maturity at our UK nursery.

    Spring schedule

    • Remove weeds by hand pulling only
    • Apply Wallbarn slow-release granular fertiliser at a rate of 50gsm
    • Clear debris from drainage outlets
    • Generally, inspect vegetation area and monitor poor growth areas
    • Overseed poor growth areas if required
    • Check irrigation system (if applicable) and replace timer batteries

    Autumn schedule

    • Remove weeds by hand pulling only
    • Clear debris from drainage outlets
    • Generally, inspect vegetation area and monitor poor growth areas
    • Overseed poor growth areas if required
    • Check irrigation system (if applicable) and drain down

    Maintenance of extensive โ€˜roll-outโ€™ green roof

    Extensive rollout sedum roofs are a multi-layered build up consisting of a protection fleece layer under an HDPE drainage tray (Protecto-drain) under a 300gsm re-cycled filter fleece under a loosely laid blend of mineral and organic substrate under a pre-grown sedum blanket or a plug planted sedum vegetation.

    Spring schedule

    • Remove weeds by hand pulling
    • Apply Wallbarn slow-release granular fertilizer at a rate of 50gsm
    • Clear debris from drainage outlets
    • Generally, inspect vegetation area and monitor poor growth areas
    • Overseed poor growth areas if required
    • Check irrigation system (if applicable) and replace timer batteries

    Autumn schedule

    • Remove weeds by hand pulling only
    • Clear debris from drainage outlets
    • Generally, inspect vegetation area and monitor poor growth areas
    • Overseed poor growth areas if required
    • Check irrigation system (if applicable) and drain down

    Wallbarn