    A Fully Compliant Decking System – Delivered Through Collaboration

    Location: Central LondonDate: January, 2025Project Size: Approx. 100sqmInstaller: Wallbarn, AB Building & ISW UK

    A Collaborative Approach to a Fully Compliant Decking System

    When an end client needed a Class A fire-rated decking system, Wallbarn partnered with AB Building and ISW UK to provide a seamless, start-to-finish solution. By working together, we ensured that every stage, from planning and estimating to material supply and installation—was handled with precision and efficiency, delivering a fully compliant, hassle-free result.

    Precision Planning & Estimating

    To ensure accurate costings and smooth project execution, we provided a detailed material estimate and quotation. Using advanced 3D scaled drawings, we helped visualise the decking system, ensuring all elements were correctly specified before work began. These visuals played a crucial role in streamlining communication between all key stakeholders:

    • For the client – The 3D drawings provided a clear representation of how the finished system would look, giving them confidence in their investment before construction even started.
    • For the contractor – They allowed for better installation planning, minimising uncertainties and providing a smooth build process.
    • For the logistics team – The precise estimates helped with accurate material calculations, scheduling deliveries, and ensuring the right resources were available at the right time.

    By aligning all stakeholders from the outset, we eliminated delays and inefficiencies, allowing the project to move forward without complications.

    A Fully Compliant & Efficient System

    Wallbarn supplied the Class A fire-rated substructure, which included our MetalPad Ex adjustable pedestals and I-Plus aluminium joists. AB Building provided their ceramic ExaDeck boards, which, like the substructure, meets the latest UK fire safety regulations, delivering a 100% non-combustible system that prioritises safety without compromising on aesthetics.

    To connect the components, only two simple fixings were required:

    • M8 Wing Nut Kit – Securely connects pedestals to joists and for joining joists together end-to-end or at right angles.
    • W Clip 60 – A hidden fixing that discreetly secures the boards while maintaining a uniform 6mm gap for drainage and clean, symmetrical lines.

    This intuitive system made installation quick and straightforward, reducing time on-site while ensuring a strong and reliable finish.

    Timely Execution from Start to Finish

    Our collaborative approach ensured the entire process was smooth and stress-free for the client. The project began with careful planning and material estimation, followed by the removal and responsible disposal of the old WPC decking. Once the site was prepared, the new materials were delivered and expertly installed, ensuring a seamless transition with minimal disruption.

    Our partnership functioned as one cohesive unit. The combination of Wallbarn’s technical expertise & products, AB Building’s premium decking materials, and ISW UK’s skilled installation team resulted in a fully compliant, high-performance decking system.

    This project proves the power of strategic partnerships—when the right companies come together, the result is a streamlined, efficient process and an impeccable final product. The client now has a fire-rated, visually stunning outdoor space that offers both safety and longevity.