fbpx

    Order / Enquire Now

    To order a product or to ask us a question, speak to our team on 0208 916 2222 or use the live chat facility in the corner of your screen. Alternatively, fill in the simple form below and we will endeavour to respond within 48 hours

    • Please see the Website terms & Conditions at the bottom of the homepage

    Drainage

    Used as a mechanical protection against soil and root movement along foundation walls. It can be installed with a 20cm overlap and fixed with nails and sealing buttons 5 cm from the top edges of the roll and 20cm from each roll. Edging profile is installed to prevent soil ingress into the cavity. Maximum build-up 8 metres high.

    Laid horizontally and fixed using sealing tape in the overlapping areas the sheets protect concrete flooring form rising damp and keep reinforcement mesh in place firmly during the concrete works.

    BIM Library

    Wallbarn