fbpx

    Order / Enquire Now

    To order a product or to ask us a question, speak to our team on 0208 916 2222 or use the live chat facility in the corner of your screen. Alternatively, fill in the simple form below and we will endeavour to respond within 48 hours

    • Please see the Website terms & Conditions at the bottom of the homepage

    News

    A Fully Compliant Class A Decking System Delivered Through Collaboration

    February 27th, 2026

    Delivering a fully compliant Class A fire-rated decking system requires more than quality materials — it demands coordination, technical precision and strong partnerships. In this project, Wallbarn worked closely with AB Building and ISW UK Ltd to provide a seamless, start-to-finish solution for the end client.

    By aligning planning, estimating, supply and installation from the outset, the team ensured that every stage was executed efficiently. The result was a fully non-combustible decking system delivered without delays, complications or unnecessary disruption.


    Precision Planning and Accurate Estimating

    A successful installation begins long before materials arrive on site. To support accurate budgeting and smooth execution, Wallbarn prepared a detailed material estimate and quotation supported by advanced 3D scaled drawings.

    These visualisations played a critical role in aligning all stakeholders:

    For the client
    The 3D drawings clearly illustrated how the finished decking system would look, providing reassurance and confidence before construction began.

    For the contractor
    Precise layouts allowed for detailed installation planning, reducing uncertainty and helping to avoid costly adjustments on site.

    For logistics teams
    Accurate material calculations ensured deliveries were correctly scheduled, minimising waste and ensuring the right components were available exactly when needed.

    By coordinating early and clearly, the team eliminated inefficiencies and allowed the project to move forward without unnecessary revisions or downtime.


    A 100% Non-Combustible System

    Wallbarn supplied the complete Class A fire-rated substructure, including:

    • MetalPad Ex adjustable pedestals

    • I-Plus aluminium joists

    AB Building provided their ceramic ExaDeck boards, which meet the latest UK fire safety regulations. When combined, the system formed a fully non-combustible solution that prioritised safety without sacrificing visual appeal.

    This integrated approach ensured compliance with current UK fire standards while maintaining the refined, contemporary finish expected of a high-quality outdoor space.


    Simple, Efficient Fixing Method

    A key advantage of the system was its intuitive and efficient fixing method. Only two core fixings were required to assemble the structure:

    M8 Wing Nut Kit
    Used to securely connect pedestals to joists and to join joists together end-to-end or at right angles. This created a stable and rigid framework with minimal complexity.

    W Clip 60
    A discreet hidden fixing used to secure the decking boards. The clip maintains a consistent 6mm drainage gap while delivering clean, symmetrical lines across the deck surface.

    This simplified installation process reduced time on site while ensuring structural reliability and a professional finish.


    Seamless Transition from Old to New

    The project followed a carefully structured sequence:

    1. Detailed planning and material estimation

    2. Removal and responsible disposal of the existing WPC decking

    3. Delivery of new materials

    4. Installation of the fire-rated substructure

    5. Secure fitting of ExaDeck boards

    By maintaining consistent communication throughout, disruption was minimised and the transition from the old system to the new Class A-compliant structure was smooth and efficient.


    Working as One Cohesive Team

    The success of the project was rooted in partnership. Rather than operating independently, Wallbarn, AB Building and ISW UK functioned as a unified delivery team.

    • Wallbarn provided technical expertise and fire-rated substructure solutions.

    • AB Building supplied premium ceramic decking boards.

    • ISW UK delivered skilled, precision installation on site.

    This integrated approach ensured compatibility across all components and removed the friction that can arise when suppliers operate in isolation.


    A Safe, Durable and Visually Refined Result

    The completed decking system delivers:

    • Full Class A fire compliance

    • Long-term structural stability

    • Clean, symmetrical aesthetics

    • Efficient drainage performance

    • Reduced maintenance requirements

    The client now benefits from an outdoor space that balances safety, durability and visual impact. The hidden fixing system enhances the clean lines of the design, while the non-combustible materials provide complete peace of mind.


    The Power of Strategic Partnerships

    This project demonstrates how effective collaboration transforms complex requirements into straightforward solutions. Through early-stage visual planning, accurate estimating and close coordination between supply and installation, the team delivered a high-performance system with no compromise on compliance or finish.

    When the right partners align from concept through to completion, the result is a streamlined process and a finished product that meets every technical, regulatory and aesthetic expectation.

    The final terrace stands as proof that a carefully engineered Class A fire-rated decking system can be both technically robust and visually impressive — offering safety, longevity and a premium finish in equal measure.

    To view the full case study, please click here.

    Wallbarn