    A Fully Compliant Class A Decking System Delivered Through Strategic Collaboration

    March 6th, 2026

    When an end client required a fully compliant Class A fire-rated decking system, Wallbarn partnered with AB Building and ISW UK Ltd to deliver a seamless, start-to-finish solution.

    By aligning expertise across planning, estimating, supply and installation, the team ensured every stage was handled with precision and efficiency. The result was a fully non-combustible, regulation-compliant decking system delivered without disruption or unnecessary delays. You can explore the full project in this fully compliant decking system case study.

    A Fully Compliant Decking System – Delivered Through Collaboration

    Precision Planning and Accurate Estimating

    Successful projects begin with careful preparation. To support accurate budgeting and smooth execution, Wallbarn provided a comprehensive material estimate and detailed quotation, supported by advanced 3D scaled drawings, as demonstrated in this decking system case study.

    These visualisations proved invaluable in aligning all stakeholders:

    For the Client
    The 3D drawings offered a clear representation of the finished decking layout, allowing the client to visualise the completed space before construction commenced. This provided confidence in both design and investment, as seen in this project overview.

    For the Contractor
    The scaled plans enabled more accurate installation planning, reducing uncertainties on site and creating a streamlined build process.

    For the Logistics Team
    Precise material calculations supported well-timed deliveries and ensured that the correct components were available exactly when required.

    By coordinating early and clearly, potential inefficiencies were eliminated, allowing the programme to progress without complications.

    A Fully Compliant Decking System – Delivered Through Collaboration

    Delivering a 100% Non-Combustible System

    Wallbarn supplied the complete Class A fire-rated substructure, combining proven, high-performance components:

    MetalPad Ex adjustable pedestals provided precise height adjustment and a fully fire-compliant foundation.

    I-Plus aluminium joists created a strong, lightweight structural framework designed for long-term stability.

    These components formed the backbone of the system and were paired with ceramic boards aligned with non-combustible porcelain decking systems, ensuring the entire build met strict fire safety requirements.

    AB Building supplied their ceramic ExaDeck boards, which meet the latest UK fire safety regulations. Combined with Wallbarn’s non-combustible substructure, the finished build achieved a fully Class A-compliant system — delivering safety assurance without compromising visual appeal. This integrated approach is clearly demonstrated in this fire-rated decking case study.

    A Fully Compliant Decking System – Delivered Through Collaboration

    A Simple and Efficient Fixing System

    One of the strengths of the system was its intuitive connection method, designed to work seamlessly with MetalPad Ex pedestals and I-Plus aluminium joists.

    Only two primary fixings were required:

    M8 Wing Nut Kit
    Used to securely connect pedestals to joists, as well as to join joists end-to-end or at right angles. This created a rigid and stable aluminium framework with minimal complexity, particularly when used with I-Plus aluminium joists.

    W Clip 60
    A concealed fixing that discreetly secures the decking boards in place. The clip maintains a uniform 6mm drainage gap, ensuring consistent spacing and clean, symmetrical lines across the deck surface — ideal for porcelain decking systems.

    This straightforward approach reduced installation time while maintaining structural integrity and a high-quality finish.

    Exadeck Installation

    A Smooth Transition from Old to New

    The project followed a carefully structured sequence, as outlined in this decking installation case study:

    By coordinating each stage closely, disruption was kept to a minimum and the installation progressed efficiently.

    Exadeck Ceramic Decking

    Operating as One Cohesive Unit

    A key factor in the project’s success was the unified working relationship between all parties. Rather than operating independently, Wallbarn, AB Building and ISW UK collaborated as a single delivery team, as highlighted in this collaborative decking case study.

    Wallbarn provided the technical design expertise and fire-rated structural system, including MetalPad Ex pedestals and I-Plus aluminium joists.

    AB Building supplied premium ceramic decking materials aligned with porcelain decking systems.

    ISW UK delivered skilled on-site installation.

    This collaborative model ensured full compatibility between components and removed the friction often associated with multi-supplier projects.

    A Safe, Durable and Visually Impressive Outcome

    The completed decking system, built using MetalPad Ex pedestals, I-Plus aluminium joists and boards aligned with non-combustible porcelain decking, provides:

    • Full Class A fire compliance
    • Long-term structural stability
    • Clean architectural lines
    • Reliable drainage performance
    • Minimal ongoing maintenance

    The client now benefits from an outdoor space that is both visually striking and built for longevity. The concealed fixing system enhances the clean, refined aesthetic, while the non-combustible materials provide complete peace of mind. You can view the finished result in this fire-rated decking case study.

    The Value of Strategic Partnerships

    This project demonstrates how effective collaboration can simplify complex compliance requirements. Through early planning, clear communication and coordinated delivery, the team transformed a regulatory necessity into a streamlined, high-performance solution.

    When the right partners align from concept through to completion, the outcome is not only technically sound but commercially efficient and aesthetically refined — as clearly shown in this Wallbarn decking case study.

    The finished terrace stands as clear proof that a carefully engineered Class A fire-rated decking system can deliver safety, durability and design quality in equal measure.

    To view the full case study, please click here.

    All information contained within this article is correct at the time of publishing. For up-to-date information, please contact us at Tel. No. 020 8916 2222 or via e-mail sales@wallbarn.com.
    Wallbarn